Welcome smoother workflow to your company with this program and constructible models. This issue has now been fixed.Free Download Trimble Tekla Structures for Windows, models created with Tekla BIM software carry the accurate, reliable, and detailed information needed for successful Building Information Modeling and construction execution. When performing a combining run, sizes not used in the job might appear in run-specific pricing maintenance. Previously, in Project Management, the AIA G702 and G703 reports formated certain job numbers as a date. In the Production Control Shipping Ticket reports, the PlannedShipDate field is now available in the Stimulsoft Reports designer. Previously, exporting purchase orders to Trimble Viewpoint from the Select Requisition/Purchase Order dialog box did not prompt for the company code, sending a blank value to the export report. Previously, in Inventory, when selecting a line item, a Save changes? prompt could appear when no changes were made in the inputs on the previously selected line item. The drop receives the grade of the chosen material to drop when TFS is performed. Splice Packages that use material of a variety of grades as sources now receive a grade that is present among the source material. Previously, when combining split tee shapes into full beams, the value grade substitutions were not being considered. In the Remote Monitor settings, the info option has been removed from the Log Level selection.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |